Stocking: We coordinate with our supplier to handle with care all the deliveries of the materials to ensure the proper care of the materials as well as the structure of the project.
|
| |
|
|
Framing: We handle standard Tenant Improvement metal stud framing from light gauge to Heavy Gauge metal stud framing.
|
|
|
|
|
| |
|
|
Preliminary: We install and hang preliminary drywall as necessary to location such as air conditioning shafts and bay, mechanical ducts, fireplaces, behind the tub, recessed lights, Drop Ceiling and soffits with ducts.
|
|
|
|
|
| |
|
|
Hanging: We guarantee that we have enough manpower to install and hang drywall in a timely manner.
|
|
|
|
|
| |
|
|
Corner: We make sure all corner beads and edge trim are set level,straight and plumbed prior to taping.
|
|
|
|
|
| |
|
|
Clean Up: We maintain a clean job site that complies with OSHA regulation and provide a safe, clean working environment not only for our crew but also to everybody working in the premises.
|
|
|
|
|
| |
|
|
Taping: We make sure we obtain an even finish prior to applying finishing coat. No tape joints,nails or screw locations visible.
|
| |
|
|
Pick Up: We assure you that we have pickup guys to do minor repairs and patch up. We touch-up drywall as required prior to applying final coat.
|
|
|
|
|
| |
|
|